Basement Reno

November 23rd, 2014 by alex

The renovations to the basement are coming along nicely. The walls and ceilings needed 500 pounds of mud to make them smooth, they were in bad shape! We took out all the old floors and the concrete is in pretty bad shape, too. We are going to level out and refinish the concrete in a sand color. The tile guys are coming next week to get started on the bathroom. We are going with a subway tile look. Brendan is refinishing the spiral stairs and it looks great! The steps were sanded down to a pretty blond color. When tile and concrete are done we will prime and paint and install the new fir doors and closets. We had someone make a few new cabinets that we will paint over. We were running low on storage. Its looking great! Should be done by Dec. 19th for our first visitor from Oz!

Screen Shot 2014-11-23 at 3.27.23 PM

Screen Shot 2014-11-23 at 3.27.42 PM

Screen Shot 2014-11-23 at 3.27.53 PM

Screen Shot 2014-11-23 at 3.28.01 PM

One Response to “Basement Reno”

  1. Craig says:

    Thanks for the images. There is a lot of work behind done. How good will it be when it is completed. I hope #thevisitorfromoz is grateful!

Leave a Reply